1. Firstly, accurately set out the slope line of the roadbed. In order to ensure the width of the roadbed, each side is widened by 0.5m. After leveling the dried base soil, use a 25T vibrating roller to static press twice. Then use 50T vibration pressure four times, and manually level the uneven...
Read more