1. Construction site: It is required to be compacted, flat, horizontal, and remove sharp protrusions.
2. Grid laying: On a flat and compacted site, the main force direction (longitudinal) of the installed grid should be perpendicular to the axis of the embankment, and the laying should be flat, w...
Read more